Type C Class Construction

Without Material House Building Contract

Without Material House Building Contract

170.00 to 220 /Sqft

Without Material House Building Contract

170.00 to 220 /Sqft

Service Includes:- ( Labor Cost )

1. free consultation by DKW professionals for your house construction cost
2. Architectural Drawing:- 2D House plan if required
3. Excavation:- Upto 4 feet for foundation
4. Foundation & Footing:- i) Upto 4 feet below ground level
ii) Upto 3 feet above ground level without steel binding works
5. Steel:- Steel cutting, bending, staircase & roof
6. Flooring:- Raw flooring
7. Brickwork:- Brick wall of 4 inch & 9 inch
8. Plastering:- Plastering work of inside & outside walls
9. Scaffolding:- Scaffolding/Shuttering work for wall & roof construction
10. Elevation:- Simple plaster elevation
11. Door & Window:- Frame fixing

Service Excluded:- (Below Services are not included & extra chargeable)

1. Kitchen slab & any/Stone Partition
2. Any Floor tiles, wall ties, granite, or marble work.
3. Septic tank
4. Overhead Water tank
5. Any type of street plumbing connection and severage Connection. Exception:- Only Concealed water pipe          fitting in wall & ground
6. Any type of electric work. Exception:- Only Concealed Conduit Electrical pipe Fittings in wall and ground
7. Railing on staircase, balcony, gates, rolling shutter
8. Main gate ramps, main gate fixing
9. Any type of putty, P.O.P & Paintwork
10. Earth fill, Electricity & water arrangements
11. 3D drawing, interior drawing, Vastu consultation, carpentry drawings
12. Boundary wall (parapet wall)
14. Electrical work
15. Plumbing work
16. Any tiling, marble, granite work
17. Plaster above the Staircase

With Material House Building Contract

With Material House Building Contract

999.00 to 1500 /Sqft

With Material House Building Contract

999.00 to 1500 /Sqft

Service Includes:-
( Labor + Raw Material Cost )
1. free consultation by DKW professional’s for your house
2. Architectural Drawing:- 2D House plan
3. Excavation:- Upto 4 feet for foundation & Footing
4. Foundation:- i) Upto 4 feet below ground level
ii) Upto 3 feet above ground level with out steel binding works
5. Steel:- Steel cutting, bending, stair case & roof lenter
6. structural shuttering
7. Brick work:- Brick wall work of 4 inch or 9 inch
8. Plastering:- Plastering work of inside & outside walls (roof platering not covered/not needed nowdays)
9. Scaffolding:- Scaffolding/Shuttering work for wall & roof lenter construction
10. Flooring:- Raw flooring & 2×2 foot floor tile
11. Elevation:- Simple plaster elevation
12. Door & Window:- Frame fixing
13. Chazzas & Lenter:- Included
14. Plaster on staircase

Service Excluded:-
(Below Services can be booked with their respective extra charges)
1. Kitchen slab & any/Stone Partition
2. Any wall tiles, granite & Marble work.
3. Ceptic tank
4. Water tank
5. Any type of street plumbing connection & Severage Connection. Exception:- Only Concealed water pipe fitting in wall & ground
6. Any type electric work. Exception:- Only Concealed Conduit Electrical pipe Fittings in wall & Ground
7. Railing on staircase, balcony, gates, rolling shutter
8. Main gate ramps, main gate fixing
9. Any type of putty, P.O.P & Paint work
10. Earth fill,Electricity & water arrangements.
11. 3d drawing,interior drawing , vastu consultation, carpenty drawings
12. 3 feet Height Boundery wall (parapet wall)
14. Electrical work
15. Plumbing work
16. Any wall tiling,marble,granite work

Advance Services

Basement Construction – Advance

205.00 /sqft

Basement Construction – Advance

205.00 /sqft

Includes House Plan+Electrical Drawing+Plumbing Drawing+Interior Design+Elevation Plan+False Ceiling Design.
Includes Mistri,Labour,Shuttering Material
Includes Raw sand flooring,Sand Plaster on wall from Inside & Stairs Work.
Any Excavation & Building material cost not included.

Ground floor Construction – Advance

185.00 /sqft

Ground floor Construction – Advance

185.00 /sqft

Includes House Plan+Electrical Drawing+Plumbing Drawing+Interior Design+Elevation Plan+False Ceiling Design
Includes Mistri,Labour,Shuttering Material
Includes Raw sand flooring,Sand Plaster on wall from Inside & Stairs Work
Any Excavation & Building material cost not included.

1st floor Construction – Advance

205.00 /sqft

1st floor Construction – Advance

205.00 /sqft

Includes House Plan+Electrical Drawing+Plumbing Drawing+Interior Design+Elevation Plan+False Ceiling Design
Includes Mistri,Labour,Shuttering Material
Includes Raw sand flooring,Sand Plaster on wall from Inside & Stairs Work
Any Excavation & Building material cost not included.

2nd floor Construction – Advance

215.00 /sqft

2nd floor Construction – Advance

215.00 /sqft

Includes House Plan+Electrical Drawing+Plumbing Drawing+Interior Design+Elevation Plan+False Ceiling Design.
Includes Mistri,Labour,Shuttering Material.
Includes Raw sand flooring,Sand Plaster on wall from Inside & Stairs Work.
Any Excavation & Building material cost not included.

×