Type A Class Construction

Without Material House Building Contract

Without Material House Building Contract

400.00 to 600 /Sqft

Without Material House Building Contract

400.00 to 600 /Sqft

Service Includes:- ( Labor Cost )
1. Free consultation by DKW professional’s for your house
2. Architectural Drawing:- Complete 2D Architectural drawings with Site visit & site measurement by DKW professional Architect’s
3. Excavation:- Upto 5 feet for foundation & Footing
4. Footing & Foundation:-
i) Upto 4 feet below ground level
ii) Upto 3 feet above ground level with steel bindind & concrete work
5. Steel:- Steel cutting, bending, binding for footing beam, Columns, slabs, stair case & roof lenter
6. Footing PCC,structural shuttering
7. Brick work:- Brick wall work of 4 inch or 9 inch
8. Plastering:- Plastering work of inside & outside walls (roof platering not covered/not needed nowdays)
9. Scaffolding:- Scaffolding/Shuttering work for wall & roof lenter construction
10. Flooring:- Raw flooring work for tiles & marble
11. Elevation:- Plaster or tile elevation
12. Door & Window:- Frame fixing
13. Chazzas & Lenter:- Included
14. Professional Electrical work
15. Professional Plumbing work
16. 3 feet Height Boundery wall or if needed grill works (parapet wall)
17. Kitchen slab & any/Stone Partition
18. Professional Floor tiles,wall tiles/granite/Marble work.
19. Ceptic tank (if required)
20. Water tank (if required)
21. Any type of plumbing fittings work & Severage Connection.
22. All electric fitting work.
23. Railing on staircase, balcony, gates, rolling shutter
24. Main gate ramps, main gate fixing
25. Any type of putty.

Service Excluded:-
1. Any Type of carpentory & Wood work not included
2. Heavy Ceiling work
3. Parabola building work
4. Earth filling
5. Complicated interior works
6. Modular kitchen wood works

With Material House Building Contract

Complete house construction contract – Type A

2,200.00 to 3000 /Sqft

Complete house construction contract – Type A

2,200.00 to 3000 /Sqft

Service Includes:- ( Labour + Raw Material Cost )

  1. Free consultation by DKW professional’s for your house
  2. Architectural Drawing:- Completed 2D Architectural drawings with site visit & site measurement support by DKW professional Architect’s
  3. Excavation:- Up to 5 feet for foundation & Footing
  4. Footing & Foundation:- i) Up to 5 feet below ground level, ii) Up to 2 feet above ground level with steel binding & concrete work
  5. Earth filling:- Up to 2 feet above ground level
  6. Steel:- Steel cutting, bending, binding for footing beam, Columns, slabs, stair case & roofing
  7. Brick work:- 4 inches inside wall & 9 inches outside wall
  8. Plastering:- Complete plastering work of inside & outside walls
  9. Flooring:- Complete tile & marble flooring
  10. Elevation:- Complete elevation
  11. Door & Windows:- All doors & windows
  12. Electricity :- All Electric work with material
  13. Plumbing :- Complete plumbing with material
  14. Railing:- Complete railings with material
  15. Paint Work:- Complete putty, pop and paint work
  16. Kitchen:- Complete modular kitchen work with granite slab and partitions
  17. Bathroom:- Complete bathroom with up to 7 feet tiles
  18. Water tank up to 2000 litre Covered

Extra and Variable Cost:- 

  1. Electricity connection – varies state to state
  2. Borewell – around ₹75000
  3. False ceiling – ₹100/- Sqft
  4. Italian marble
  5. Watchman – ₹10000/- Month
  6. Municipal and legal permissions

Advance Services

Basement Construction – Advance

205.00 /sqft

Basement Construction – Advance

205.00 /sqft

Includes House Plan+Electrical Drawing+Plumbing Drawing+Interior Design+Elevation Plan+False Ceiling Design.
Includes Mistri,Labour,Shuttering Material
Includes Raw sand flooring,Sand Plaster on wall from Inside & Stairs Work.
Any Excavation & Building material cost not included.

Ground floor Construction – Advance

185.00 /sqft

Ground floor Construction – Advance

185.00 /sqft

Includes House Plan+Electrical Drawing+Plumbing Drawing+Interior Design+Elevation Plan+False Ceiling Design
Includes Mistri,Labour,Shuttering Material
Includes Raw sand flooring,Sand Plaster on wall from Inside & Stairs Work
Any Excavation & Building material cost not included.

1st floor Construction – Advance

205.00 /sqft

1st floor Construction – Advance

205.00 /sqft

Includes House Plan+Electrical Drawing+Plumbing Drawing+Interior Design+Elevation Plan+False Ceiling Design
Includes Mistri,Labour,Shuttering Material
Includes Raw sand flooring,Sand Plaster on wall from Inside & Stairs Work
Any Excavation & Building material cost not included.

2nd floor Construction – Advance

215.00 /sqft

2nd floor Construction – Advance

215.00 /sqft

Includes House Plan+Electrical Drawing+Plumbing Drawing+Interior Design+Elevation Plan+False Ceiling Design.
Includes Mistri,Labour,Shuttering Material.
Includes Raw sand flooring,Sand Plaster on wall from Inside & Stairs Work.
Any Excavation & Building material cost not included.

×